Bandar to Kerman 9-axle bogie

Heavy Transformer Transport Project
From Bandar Abbas to Kerman | Weight: 110 tons | 9-Axle Modular Trailer

📍 Origin: Bandar Abbas – Heavy Cargo Terminal
📍 Destination: Kerman – Regional Power Site
🔋 Cargo Type: High-voltage industrial transformer
🚛 Transport Fleet: 9-axle modular trailer with specialized pullers
📅 Execution Date: Spring 2025

Project Overview:

In this mission, our company managed the transportation of a 110-ton industrial transformer from Bandar Abbas to its final destination in Kerman Province. Due to the excessive weight and sensitive nature of the cargo, the operation required a 9-axle modular trailer system with precise weight distribution and strict adherence to heavy haul transport regulations.

Key Execution Steps:

  • Precision loading using ultra-heavy-duty cranes at Bandar Abbas

  • Deployment of a 9-axle modular trailer to distribute weight and ensure road safety

  • Technical escort and special night-time travel permits coordinated with the Road Maintenance and Transportation Organization

  • Continuous monitoring of the trailer’s mechanical status throughout the route

  • Safe unloading at the power project site with specialized lifting equipment

Outcome:
The operation was completed successfully without any damage to the cargo. This project reflects the company’s strong operational capabilities in handling domestic heavy-load transport of sensitive equipment.